The main stages are indicated below:
- User Requirements Specification (URS)
- Design Qualification (DQ)
- Installation Qualification (IQ)
- Operational Qualification (OQ)
- Performance Qualification (PQ)
MAR supplies FAT (Factory Acceptance Test) protocol validation and SAT (Site Acceptance Test) protocol; on request IQ & OQ protocols (Installation Qualification & Operational Qualification).
The complete validation test for the equipment will be performed at MAR’s site, following complete test list included in the FAT Protocol.
MAR can perfom if requested, as an optional service, SAT Protocol or IQ-OQ validation Protocol at customer’s site.